Contents / Clause 6.4
Clause 6.4: Deoxys-TBC tweakey schedule
Text on this site
Title only, body not in the public preview
Citation
ISO/IEC 18033-7:2022, clause 6.4 (contents entry, page 6)
Key date
15 September 2027 Estimated
What the clause requires
Text not in the public preview
The published contents list entry reads ISO/IEC 18033-7:2022, clause 6.4 (contents entry, page 6). The body is not in the sample we can read, so this page states no requirement from it and does not describe it from memory.
What the public text does not state
- The entire body of clause 6.4
- Any amendment change to the schedule
What it means for you
This page exists so that the record has no hole. The document has a subclause that derives the per-round sub-tweakeys for Deoxys-TBC, and the ISO public preview stops before it. Rather than describe it from memory or from a paper about the cipher, the record states the title, the page and the fact that the text is not in the public preview.
That honesty has a practical value. An implementation review has to cover the schedule, because the schedule is where the key and tweak are loaded and where the round constants are applied. The questions to put to the engineering team are the same questions the published clause will answer: how the tweakey is divided, how the sub-tweakey is updated each round, and how the tweak length changes the update.
The evidence line is therefore a request, not a finding. Ask for the design note that traces the schedule, and for the known-answer test that exercises more than one round. When the purchased text is available, this page is replaced with a statement of the clause and the register is reissued at no extra charge to kit buyers.
Evidence to keep
| Artefact | Owner | Why it matters |
|---|---|---|
| Design note tracing the sub-tweakey derivation to the implementation | Engineering | The schedule is where key and tweak handling is visible. |
| Known-answer test that exercises multiple rounds and both directions | Engineering | A one-round test would not catch a schedule defect. |
| Purchase record for the base standard, so clause 6.4 can be read in full | Standards owner | The page states that the text is not in the public preview until it is bought or licensed. |
How to verify it
Ask whether the review covered the schedule. If the answer cites a paper or a blog rather than the standard, the trace is not to the text.
Dates
The kit plan for clause 6.4 sets the evidence review at 17 June 2027, 90 days before the estimated publication date of 15 September 2027.
Cross references
- 6 Deoxys-TBC
- 6.1 Deoxys-TBC versions
- 6.2 Deoxys-TBC encryption
- A.1 Deoxys-TBC-256 example
- A.2 Deoxys-TBC-384 example
Where this comes from
Source for this page
- ISO/IEC 18033-7:2022, public preview, 11 of 18 pages. Foreword, introduction, clauses 1 to 6.3 and the contents list. Used for every quoted fact about the base text.
- The other sources behind this page are listed on sources.
Retrieved 2026-10-20. Our own statement, cited so you can check it.